calqulio.
◎ English · Global

Safety stock — Inventory Reorder Point Calculator

Inventory Reorder Point: Calculate safety stock from Reorder stock level, Average daily demand, Lead time. Check the formula, input units and worked result on this page.

Enter your values

Formula symbol: r. Enter a numeric value. Use a non-negative value.
Formula symbol: d. Enter a numeric value. Must be greater than zero.
d
Formula symbol: l. Required unit: d. Must be greater than zero. Allowed range: 0.001–3,650.

Use a decimal point, without thousands separators.

Daily demand and lead time must use the same day convention. Safety stock and supplier lead time are not estimated by this tool.
Example result
Safety stock
120

The initial result uses the example values. Enter your own values and calculate again.

Edit inputs

How it works

Average demand during a fixed lead time is combined with separately chosen safety stock. This form solves for safety stock; enter the known quantities in Reorder stock level, Average daily demand, Lead time.

Inputs and units
Safety stock — Inventory Reorder Point Calculator · Inputs and units
InputExample valueWhat to enter
Reorder stock level520Formula symbol: r. Enter a numeric value. Use a non-negative value.
Average daily demand20Formula symbol: d. Enter a numeric value. Must be greater than zero.
Lead time20 dFormula symbol: l. Required unit: d. Must be greater than zero. Allowed range: 0.001–3,650.
s = (r - (d * l))

Worked example

Show example inputs and results

This example is generated by the same calculation engine using the starting values in the form. Your own inputs produce your own result.

Reorder stock level
520
Average daily demand
20
Lead time
20 d

Complete example results

Safety stock
120

Reading the result

The result solves for safety stock from the entered quantities. Check the result unit and the formula conditions before using it.

Questions and answers

Can I use the example values for my own calculation?

The example values illustrate the calculation. Replace every input with your own information, especially dates, rates and the selected operation.

When can I use the safety stock result?

Daily demand and lead time must use the same day convention. Safety stock and supplier lead time are not estimated by this tool.

Why are some results rounded?

Results display up to 8 decimal places. Calculations use the unrounded values; very small values use scientific notation. JavaScript floating-point arithmetic can introduce tiny rounding differences.

Are my inputs sent to a server?

The calculator processes inputs in your browser. Its code does not send your values to a server.

Method sources: live.ocw.mit.edu

Methods & accuracy

What would you like to calculate?

Browse all calculators

Graphing calculator ↗