calqulio.
◎ English · Global

Average daily demand — Inventory Reorder Point Calculator

Inventory Reorder Point: Calculate average daily demand from Reorder stock level, Lead time, Safety stock. Check the formula, input units and worked result on this page.

Enter your values

Formula symbol: r. Enter a numeric value. Use a non-negative value.
d
Formula symbol: l. Required unit: d. Must be greater than zero. Allowed range: 0.001–3,650.
Formula symbol: s. Enter a numeric value. Use a non-negative value.

Use a decimal point, without thousands separators.

Daily demand and lead time must use the same day convention. Safety stock and supplier lead time are not estimated by this tool.
Example result
Average daily demand
20

The initial result uses the example values. Enter your own values and calculate again.

Edit inputs

How it works

Average demand during a fixed lead time is combined with separately chosen safety stock. This form solves for average daily demand; enter the known quantities in Reorder stock level, Lead time, Safety stock.

Inputs and units
Average daily demand — Inventory Reorder Point Calculator · Inputs and units
InputExample valueWhat to enter
Reorder stock level520Formula symbol: r. Enter a numeric value. Use a non-negative value.
Lead time20 dFormula symbol: l. Required unit: d. Must be greater than zero. Allowed range: 0.001–3,650.
Safety stock120Formula symbol: s. Enter a numeric value. Use a non-negative value.
d = ((r - s) / l)

Worked example

Show example inputs and results

This example is generated by the same calculation engine using the starting values in the form. Your own inputs produce your own result.

Reorder stock level
520
Lead time
20 d
Safety stock
120

Complete example results

Average daily demand
20

Reading the result

The result solves for average daily demand from the entered quantities. Check the result unit and the formula conditions before using it.

Questions and answers

Can I use the example values for my own calculation?

The example values illustrate the calculation. Replace every input with your own information, especially dates, rates and the selected operation.

When can I use the average daily demand result?

Daily demand and lead time must use the same day convention. Safety stock and supplier lead time are not estimated by this tool.

Why are some results rounded?

Results display up to 8 decimal places. Calculations use the unrounded values; very small values use scientific notation. JavaScript floating-point arithmetic can introduce tiny rounding differences.

Are my inputs sent to a server?

The calculator processes inputs in your browser. Its code does not send your values to a server.

Method sources: live.ocw.mit.edu

Methods & accuracy

What would you like to calculate?

Browse all calculators

Graphing calculator ↗